Neil Lane

Vintage Scripto RED Long Leads Smooth Writing NIB NOS Price is for 3 Three boxes

Description: This listing is for 3 three boxes of these RED colored pencil leads. They're new old stock. Each box comes with 3 leads, see photos.I do not know the size of the lead assume .5mm No refunds accepted on this item. Thanks for looking and have a great day! Please plan on paying within 3 days of winning the auction. All items are described as accurately as possible to the best of my knowledge. All items are sold as is. Please look closely at each photograph and note any defects in the item if there are any. If I am selling a vintage, antique, used or previously worn item, do not expect perfection unless I specifically say the item is perfect. Returns are accepted only if the item has been grossly misrepresented in the listing and/or pictures. I will not refund your shipping cost and you will have to pay for the item to be shipped back. Refunds will be made after the item is received by me, usually within 1-2 days.*Any request for return must be made within 48 hours of your receiving the item. Any return must be shipped in the same manner as was shipped to you, and in the same condition as originally shipped.

Price: 8.95 USD

Location: Valencia, California

End Time: 2025-01-19T17:57:57.000Z

Shipping Cost: 4.4 USD

Product Images

Vintage Scripto RED Long Leads Smooth Writing NIB NOS Price is for 3 Three boxesVintage Scripto RED Long Leads Smooth Writing NIB NOS Price is for 3 Three boxesVintage Scripto RED Long Leads Smooth Writing NIB NOS Price is for 3 Three boxesVintage Scripto RED Long Leads Smooth Writing NIB NOS Price is for 3 Three boxesVintage Scripto RED Long Leads Smooth Writing NIB NOS Price is for 3 Three boxesVintage Scripto RED Long Leads Smooth Writing NIB NOS Price is for 3 Three boxes

Item Specifics

All returns accepted: ReturnsNotAccepted

Brand: scripto

Vintage: Yes

Recommended

Scripto Aim'nFlame II Torch Flame Utility Lighter
Scripto Aim'nFlame II Torch Flame Utility Lighter

$67.10

View Details
Vintage Scripto Mechanical Pencil .9mm Chrome Trim Yellow Barrel
Vintage Scripto Mechanical Pencil .9mm Chrome Trim Yellow Barrel

$15.64

View Details
Scripto Multi-Purpose Wind-Resistant Lighter Torch Flame Random Color 1-pack
Scripto Multi-Purpose Wind-Resistant Lighter Torch Flame Random Color 1-pack

$7.99

View Details
VINTAGE PIEZO-ELECTRIC BUTANESILVER LIGHTER FROM SCRIPTO w/BOX 10.24
VINTAGE PIEZO-ELECTRIC BUTANESILVER LIGHTER FROM SCRIPTO w/BOX 10.24

$6.95

View Details
Lot Of 6 Vintage Fountain Pens: WEAREVER, AG, SCRIPTO, MOTHER OF PEARL
Lot Of 6 Vintage Fountain Pens: WEAREVER, AG, SCRIPTO, MOTHER OF PEARL

$22.00

View Details
Vintage RARE 3x Scripto Double-End Ballpoint Pen  Slide T420
Vintage RARE 3x Scripto Double-End Ballpoint Pen Slide T420

$40.00

View Details
Scripto Lighter Views Lighters View Spark Adjustable Flame 7 Pack Disposable New
Scripto Lighter Views Lighters View Spark Adjustable Flame 7 Pack Disposable New

$5.25

View Details
Vintage Scripto Pen And Mechanical Pencil w/ Box Gold & Black
Vintage Scripto Pen And Mechanical Pencil w/ Box Gold & Black

$20.00

View Details
Random Lot of  7 Mechanical Pencil - Skillcraft -Bic - ITOYA - Scripto
Random Lot of 7 Mechanical Pencil - Skillcraft -Bic - ITOYA - Scripto

$12.99

View Details
OG&E Scripto Combination Set Mechanical Pencil Lead With Box Wooden Insert Vtg
OG&E Scripto Combination Set Mechanical Pencil Lead With Box Wooden Insert Vtg

$29.95

View Details